Looking for roof replacement near you? The fastest way to get accurate pricing and a correct scope is a documented, inspection-first evaluation. Inspector Roofing and Restoration serves Alpharetta and North Metro Atlanta with a clear process: inspect → document → define scope → install as a full system (flashings + ventilation + water management).
Quick links: Roof Inspection • Storm Damage Hub • Insurance Claim Roofing • Case Studies • Roof Repair
Most homeowners need three things: scope clarity, timeline certainty, and proof the replacement is a full system.
Planning-level ranges — your inspection confirms the correct scope, system details, and pricing drivers.
Pricing depends on roof size, pitch, layers, decking needs, flashings detail, ventilation, and the system you choose.
Full guide: Roof Replacement Hub
Most single-family replacements complete in one day once scheduled and materials are staged.
Details: Timeline Guide
Start with an inspection so you don’t overbuy (replace when repair is enough) or underbuy (repair when the system is failing).
Book now: Schedule Inspection
A roof replacement should be a full-system install, not a “shingles-only” swap.
We document conditions (photos + system checkpoints) to confirm roof health and failure points.
You receive a clear plan including flashings, ventilation balance, underlayment, and water management details.
Materials are staged and the install day is set. Storm-related paths align with documentation steps.
We install, clean up thoroughly, and do a walkthrough so you know exactly what was installed.
Want the authority guide? Roof Replacement Hub (cost drivers, timeline, financing, repair vs replace).
Choose your city for a localized roof replacement page (stronger “near me” relevance + internal authority).
Not sure where to start? Start with Roof Inspection for scope clarity. If you suspect a storm event, use Storm Damage Hub and Insurance Claim Roofing.
Clear answers for replacement, storm, insurance, and scheduling.
A documented inspection confirms whether damage is isolated (repairable) or widespread (replacement). We check system performance (flashings, ventilation, underlayment) and document findings with photos so the scope is clear. Start here: Roof Inspection.
Yes. We provide claim-ready documentation and a clear scope of work. Policy outcomes vary by carrier and coverage, so we focus on evidence and scope clarity rather than promises. Learn more: Insurance Claim Roofing.
Most single-family replacements are completed in one day once scheduled and materials are staged. Storm/insurance projects can add time for documentation and approval steps. Details: Timeline Guide.
The system details: ventilation balance, flashings at penetrations/walls/chimneys, underlayment, drip edge, and clean water-management transitions. These details decide whether the roof lasts.
Financing options may be available. The fastest path is to schedule an inspection and receive a written estimate first: Schedule Inspection.
Call for the nearest inspection slot. You’ll get scope clarity, a written plan, and a full-system replacement path.
Prefer the guide first? Roof Replacement Hub →